Applying maintenance coat of D1

Viewing 2 posts - 1 through 2 (of 2 total)
  • #78


    I want to apply a maintenance coat of D1 tomorrow in fine weather but rain is forecast for the following night. Is this ok or will the rain damage the oil? Basically what is the recommended ‘drying time’ before rain can not cause damage?

    #626


    Ensure at least 2 days of dry weather, soaked in and completely dry before use.

    Do use Prep Deck to strip and then neutralise with Net Trol, allow to dry before oiling… this will provide the best results and allow the oil to fully penetrate the timber. Without the oil may form a film on the surface which is not desirable.

Viewing 2 posts - 1 through 2 (of 2 total)
  • You must be logged in to reply to this topic.